Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    VeriPark Named to 2026 IDC FinTech Rankings Top 100

    October 27, 2026

    Iran war threatens Africa food security, trade officials warn

    October 27, 2026

    Modi meets BRICS MPs at 12th Parliamentary Forum in Delhi

    October 27, 2026
    Facebook X (Twitter) Instagram
    Tangier JournalTangier Journal
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    Tangier JournalTangier Journal
    Home » CBE’s 233 MW Kamoa Project Comes Online with AIKO ABC Modules
    PR Newswire

    CBE’s 233 MW Kamoa Project Comes Online with AIKO ABC Modules

    September 12, 2026
    Facebook Twitter Pinterest LinkedIn Tumblr Email

    YIWU, China, Sept. 12, 2026 /PRNewswire/ — CrossBoundary Energy’s (CBE) 233 MW Kamoa solar project in the Democratic Republic of the Congo (DRC) has achieved full-capacity grid connection and entered commercial operation. Completed just 16 months after the power purchase agreement was signed, the project sets a new delivery benchmark for large-scale solar in Africa.

    Image source: Kamoa Copper S.A.

    Powered by AIKO’s high-efficiency ABC modules, Kamoa is Africa’s first project to provide round-the-clock baseload power entirely through an integrated solar-plus-storage system. It offers a replicable clean energy solution for mining operations seeking both reliable power and lower carbon emissions.

    The project is located next to the Kamoa-Kakula Copper Complex, one of the world’s largest copper mining operations. Remote mines across Africa have traditionally relied on diesel generators to sustain continuous production, leaving operators exposed to fuel-price volatility and increasing carbon-related compliance costs.

    Kamoa uses approximately 360,000 AIKO 655 W dual-glass modules in the 66-cell format. With a mass-production efficiency of 24.2%, each module delivers 30 W more power than comparable products of the same format. Their superior temperature coefficient and hotspot suppression performance also support stable generation and system safety under the mine’s hot, high-irradiance conditions.

    By combining lower levelized cost of energy with reliable round-the-clock supply, the project replaces conventional diesel generation, reduces energy-price risk and lowers the carbon footprint of Kamoa’s copper production. This strengthens the competitiveness of its products as carbon requirements tighten in international markets.

    Over its 30-year lifecycle, Kamoa is expected to generate 7.8 billion kWh of electricity and avoid approximately 78,800 tonnes of carbon emissions annually. As the DRC diversifies beyond its hydropower-dominated energy mix, the project provides a valuable model for integrating renewable power with mining across Africa.

    The successful delivery of Kamoa further strengthens AIKO’s position in Africa’s fast-growing solar market. AIKO will continue to advance the global energy transition through high-efficiency technology and long-term value creation.

    Cision View original content to download multimedia:https://www.prnewswire.co.uk/news-releases/cbes-233-mw-kamoa-project-comes-online-with-aiko-abc-modules-302876862.html

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    Related Posts

    VeriPark Named to 2026 IDC FinTech Rankings Top 100

    October 27, 2026

    XCMG Deploys Heavy Equipment to Support Nairobi Building Collapse Rescue

    October 27, 2026

    XCMG Secures Order for 500 on-highway trucks in Zambia

    October 27, 2026
    Latest News

    Iran war threatens Africa food security, trade officials warn

    October 27, 2026

    Modi meets BRICS MPs at 12th Parliamentary Forum in Delhi

    October 27, 2026

    Microsoft voluntary exit offer covers 27% of its workforce

    October 27, 2026

    Zambezi Region records 33,944 malaria cases since January

    October 26, 2026

    South Korea current account surplus hits $116.63 billion in Q2

    October 26, 2026

    WHO calls for stronger Ebola surveillance in DR Congo

    October 24, 2026

    India and Poland agree to double bilateral trade by 2030

    October 24, 2026

    Russia and Oman trade hits 10-year high at $1.5 billion

    October 23, 2026
    © 2026 Tangier Journal | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.